Removing the core pile rig from Thermae Bath Spa construction site, 7am 19 February 2001
2 7 c m
40cm
actual image size: 32cm x 19cm

Removing the core pile rig from Thermae Bath Spa construction site, 7am 19 February 2001

Chinca, Carlo

© This image is not to be copied or published without permission

Description

Securing it to the low loader. From the photographic collection of Bath based Carlo Chinca who was commissioned to record the construction of the Thermae Bath Spa.
 

Artist / Photographer

 

Image Reference

31253
 

Collection Reference

Private 3704/A
 

Original Width (mm)

35
 

Original Height (mm)

20
 

Collection Location

Private Collection
 

buy a print

Select size
 
Select finish
 
How many prints?
 
£20.00
 

buy a framed print

buy a canvas

buy a framed canvas