Lifting 'green' blocks underground for drying
3 4 c m
actual image size: 32cm x 26cm

Lifting 'green' blocks underground for drying

© This image is not to be copied or published without permission


After mining, the blocks need to be dried slowly. In the winter this is done underground (as seen here), and in summer on the surface in the stacking grounds.

Image Reference


Collection Reference

MOBAW panel 11

Original Width (mm)


Original Height (mm)


Collection Location

Museum of Bath at Work

buy a print

Select size
Select finish
How many prints?

buy a framed print

buy a canvas

buy a framed canvas